| Types of Trainings : |
| 1) System |
| 2) Quality |
| 3) Advance Quality Techniques |
| 4) 5S |
| 5) Lean |
| 6) Defensive Driving Training |
7) Others |
8) Defensive Driving Training for Fork Lift / Stackers / 2/4/6 Wheeler etc |
Area | Topics |
System | Awareness on ISO standards and current change in requirements |
| 7 Management Principles | |
| SIPOC & PDCA Cycle | |
| ISO 9001 :2015 QMS | |
| Risk Mitigation methodology - Risk based Thinking | |
| Internal Quality Auditor training with certification | |
| Training on Work Instruction , System procedures, Formats and Records | |
| Converting procedures and Instructions into flow diagrams | |
| Redifining Quality Manual as per ISO 9001 : 2015 | |
| Conducting Internal Audit , Audit questionnaire, Process Check list | |
KRA- KPI-Weekly System review- MRM-MRM Review | |
| Quality | What is Quaity |
| 7 QC Tools | |
| Brain Storming methodology | |
| Fish bone diagram- Cause & Effect Analysis - Ishikawa Diagram | |
| Root Cause Analysis : Why ? -Why? Analysis - 5W? Analysis - 5W1H Understanding | |
| Root Cause and Corrective Measures ( RCCM ) | |
| A3 Methodology | |
| Corrective Action ( NCCA ) | |
| Calibration and validation | |
| 8Discipline Methodology ( 8D ) | |
| Advance Quality Techniques | Measuring Techniques |
| Drawing Reading and identifying the relevant processes and the bottlenecks and drawing balooning | |
| Process Feasibility Study reporting | |
| Process Flow diagrams ( PFD ) | |
| Failure Mode and Effect Analysis ( FMEA ) | |
| Process Control Plan | |
| Measurement System Analysis ( GRR Study ) | |
| Process Capability Study ( Cp - CpK Study ) | |
| Initial Supplier Inspection Reporting ( ISIR Methodology ) | |
| PPAP - APQP process | |
| 5S | 5S - A Discipline |
| Implementaion of 5S : 1S -2S-3S | |
| Benefits of 5S | |
| Team formation -defining the zones-naming the zones | |
| Lean | 8 Wastes |
| NVA - VA | |
| Value Stream Mapping | |
| Learning to see | |
| Layout correction, reducing movement, Appropriate storage and stacking methods | |
| Creatining Work Order Culture with 3 days FG inventory turn | |
| Understanding the consumption pattern and defining the RoL and sub store system | |
| Material flow study and understanding the bottlenecks and corrections for line balancing | |
| Implementaion of One piece flow | |
| Other | Production as a process current and future target phase |
| Quality as a process current and future target phase | |
| Pretreatment as a process with controls and remedial measures | |
| Powder Coating as a process with controls and remedial measures | |
| Coating Process / Coater Validation | |
| Welding Positions and Defects | |
| Welding Process / Welder Qualification | |
| Plant Safety | |
| Awareness on Industrial Environmental Aspects & Impacts |